To complete the project compliance tool you will need to know:
-
The date of expected commencement and completion of the project(s).
-
The expected life of the building in which the project is due to be implemented.
-
Salix funding requested for each project including any appropriate sub-metering.
-
Salix funding requested expressed as % contribution of the total project cost (where an application not asking Salix for the full amount of the project).
-
The average price expected to be paid for energy used in the project over the payback period of the project.
-
The load used by the existing equipment prior to the change and the load after installation of the new technology to give an annual kWh saving; from the above, the % kWh you are projecting to save.
-
Gather supporting information such as calculations, technical specifications, or evidence of project costs to be attached alongside the project compliance tool.